Maintain

A twice-a-year check keeps heating, cooling, and refrigeration running before the first hot or cold snap. 50Amped comes in spring and fall so small problems do not become after-hours breakdowns.

REQUEST A MAINTENANCE VISIT

Tap a date on the calendar, then pick a time.

Requested date & time

November 2026

SunMonTueWedThuFriSat

Tap a day to see open hours

  • Indoor and outdoor unit walk-through
  • Filter, coil, and condensate drain check
  • Thermostat, safeties, and electrical connections on the system
  • Refrigerant and airflow notes, EPA-backed where refrigerant is involved
  • A clear list of what can wait and what should be quoted now

$179 yearly residential membership — a maintenance check every 6 months / twice a year ($425 commercial).

Call 24/7 · (865) 507-1659

ELECTRICAL AND HVAC-R

50AMPED Electrical and HVAC-R Services

MAINTENANCE NEWSLETTER

50AMPED Newsletter Maintenance Edition

Electrical safety standards

50Amped uses national and workplace electrical standards as the baseline for light electrical, HVAC-R connections, and EV charging conversations in East Tennessee. The inspector who signs the job — the Authority Having Jurisdiction (AHJ) — has the last word.

  • NFPA 70 — National Electrical Code (NEC)

    The U.S. standard for safe electrical installation. Tennessee’s statewide minimum is still the 2017 NEC with state amendments. Knoxville, Cleveland, and Chattanooga may adopt a newer cycle or extra rules. We confirm the local edition before quoting new circuits or EV gear.

  • GFCI — NEC 210.8

    Ground-fault protection for wet and outdoor locations: bathrooms, kitchens, garages, outdoors, unfinished basements, and many laundry/utility sinks. Test GFCI outlets monthly. A trip that will not reset is a stop — not a reset-and-hope.

  • AFCI — NEC 210.12

    Arc-fault protection for living areas (bedrooms, family rooms, hallways, and more, depending on the adopted cycle). AFCI breakers catch dangerous arcing that a regular breaker can miss. Tennessee amendments make some AFCI locations optional at the state minimum — the city inspector still decides.

  • EV charging — NEC Article 625

    Level 2 chargers are a continuous load. Circuit size, disconnect, and GFCI/receptacle rules depend on hardwired vs plug-in and the code year in force. Load calculation on the existing panel comes first so the charger does not starve the house.

  • OSHA & NFPA 70E

    Workplace electrical safety and arc-flash practice. 50Amped carries OSHA training for field work. Commercial jobs follow lockout, PPE, and equipment clearances — not homeowner shortcuts.

AT HOME

  • Warm, buzzing, or discolored outlets and switches — replace, do not paint over.
  • A breaker that trips immediately: unplug, do not keep resetting.
  • Extension cords are temporary. Permanent heat from a cord is a red flag.
  • Outdoor HVAC disconnects and EV chargers need a clear working space.
  • Sparking, burning smell, or a panel that feels hot: stop and call a qualified electrician or emergency services.

General home-safety information only — not electrical advice from 50Amped LLC, not a diagnosis, and not a substitute for a licensed electrician. 50Amped offers light electrical service within current credentials. Panel work, new circuits, and work in the wall require a qualified electrician. Sparking, a burning smell, or a breaker that will not stay on: stop, and contact a qualified electrician or emergency services as needed.